ASTM E2026 · ASTM E2557

Seismic risk assessments (PML) for Northern California properties

Field Assessor and Senior Assessor services for due diligence firms and lenders: an engineer's site visit, document review, and SEL/SUL loss estimates that hold up to review.

The question

Is this building an acceptable earthquake risk?

That's what a lender is asking when it orders a seismic risk assessment, still widely called a "PML." The answer comes from two things: how hard the ground is likely to shake at the site, and how this particular building will respond.

The first comes from maps and data. The second depends on what an engineer sees on site: the lateral system, its connections, irregularities, condition and any retrofits. That second part is where a structural engineer in the field makes the difference.

PML, SEL and SUL explained
SELScenario expected loss
The average expected repair cost for a defined earthquake, as a percentage of replacement cost.
SULScenario upper loss
The 90th-percentile loss for the same earthquake: a level the loss is unlikely to exceed.
SiteSite stability
Fault rupture, liquefaction, landslide and other ground hazards at the property.
BldgBuilding stability
Whether the structure is at risk of collapse or partial collapse in strong shaking.

Roles

Field Assessor, Senior Assessor, or both

ASTM E2026 separates the person who observes the building from the person responsible for the conclusions. I can take either role, or both on the same project.

Field Assessor

I visit the property, review the available documents and gather everything the loss estimate depends on, delivered in your forms and photo standards for your Senior Assessor.

  • Site observation and photo log
  • Structural system and deficiency notes
  • Your template, your schedule

Senior Assessor

As a licensed structural engineer, I evaluate the information, estimate the building's SEL and SUL, and sign the assessment. I also review other assessors' field work when needed.

  • SEL / SUL loss estimates
  • Signed engineering conclusions
  • Available for reviewer questions

Scope

What's included

The exact scope follows your engagement letter and the ASTM level of investigation. A typical assignment includes:

  • Review of available drawings, permits, retrofit records, prior reports and geotechnical data
  • Site visit by a licensed structural engineer, including roof, basement and crawlspace where accessible
  • Identification of the lateral system, load path, irregularities and visible deficiencies
  • Site observations: slopes, signs of settlement, adjacent buildings and soil indicators
  • Organized photo log and field notes in your template or software
  • As Senior Assessor: SEL and SUL estimates and a signed assessment

Building types

Buildings I assess

  • Concrete tilt-up
  • Wood-frame multifamily
  • Soft-story buildings
  • Steel moment frames
  • Steel braced frames
  • Concrete frames & walls
  • Reinforced masonry
  • Unreinforced masonry
  • Podium mixed-use
  • Retail centers
  • Hospitality
  • Medical office

Two decades in steel moment-connection technology means extra depth on steel frames, including pre-1994 welded connections.

Process

How an assignment works

Built around your template and your due date.

  1. Send the assignment

    Property address, scope (E2026/E2557 level, Field or Senior Assessor), building basics and your due date. I confirm availability and fee quickly.

  2. Document review

    Drawings, permits, prior reports, retrofit records and geotechnical data when available, so the site visit is focused on what matters.

  3. Site visit

    A structural engineer walks the building: lateral system, connections, irregularities, condition, site hazards. Everything is photo-documented.

  4. Deliverables

    Field notes and photo log in your template, or a signed assessment with SEL/SUL as Senior Assessor. I stay available for reviewer questions.

FAQ

Seismic risk assessment questions

What is the difference between a Field Assessor and a Senior Assessor?

The Field Assessor visits the property, observes the structure and site, reviews available documents and collects the information the loss estimate depends on. The Senior Assessor is the qualified engineer who evaluates that information, estimates the building’s earthquake loss (SEL and SUL) and signs the assessment. I can fill either role, or both on the same project.

Which standards do you work to?

Seismic risk assessments follow ASTM E2026 (the guide for seismic risk assessment of buildings) and ASTM E2557 (the practice for probable maximum loss evaluations in earthquake due diligence), along with the specific requirements of the lender or due diligence firm that ordered the work.

What do PML, SEL and SUL mean?

PML (probable maximum loss) is the older, catch-all term for an estimate of earthquake damage as a percentage of a building’s replacement cost. ASTM standards replaced it with more precise measures: SEL (scenario expected loss) is the average expected loss for a defined earthquake, typically the ground motion with a 10% chance of being exceeded in 50 years; SUL (scenario upper loss) is the 90th-percentile loss for that same earthquake.

What property types do you assess?

Office, retail, industrial and warehouse (including concrete tilt-ups), multifamily, hospitality, mixed-use, medical office and self-storage, in wood, concrete, masonry and steel construction.

What do you need from me to get started?

The property address, the scope (for a seismic study, the ASTM level and whether you need a Field or Senior Assessor), building basics such as age, size and number of stories, your due date and a site contact. Drawings, prior reports and any retrofit records help, but are not required to start.

Can you assess a building that has already been seismically retrofitted?

Yes. I review the retrofit drawings and permits when they are available and verify in the field that the work is there and appears complete, because a documented, completed retrofit can change the loss estimate significantly.

Insights

Further reading

2 min read

What a Seismic Field Assessor Checks on Site

A structural engineer’s walk-through of a seismic risk assessment site visit: documents, load path, irregularities, condition and site hazards.

  • Field assessment
  • Seismic risk
  • Structural

Need a PML in Northern California?

Send the address, scope and due date. You’ll hear back with availability and a fee.

Request an assessment